Works Completed

S. No. Name of Project Client Work Performed Value of work-done (in NPR) Remarks
1 Kathmandu–Terai/Madhesh–Expressway Road Project; Package-1 Nepal Army / China State Construction & Engineering Corp. Ltd. • Boring Piles
• Pile Connecting
• Supply and renting of construction equipment
140 Million
2 SASEC Roads Improvement Project; Butwal Road Expansion; Package-1 Department of Roads / China State Construction & Engineering Corp. Ltd. • Construction of Major & Minor RCC Bridges (15 Nos)
• Pre-cast Concrete Girder launching
• Road Embankment Construction
• Masonry Retaining Wall
• Pile Testing (PIT, PDA, ULT, Pull-Out)
• Supply & renting of construction equipment
215 Million
3 SASEC Roads Improvement Project; Butwal Road Expansion; Package-2 Department of Roads / China State Construction & Engineering Corp. Ltd. • Construction of Major & Minor RCC Bridges (7 Nos)
• Pre-cast Concrete Girder launching
• Road Embankment Construction
• Pile Testing (PIT, PDA, ULT, Pull-Out)
180 Million
4 Air Transport Capacity Enhancement Project (Kathmandu) Civil Aviation Authority of Nepal / Sanjose S.A. • Runway Embankment Filling
• Taxi-way Construction
• Terminal Building Construction
• Supply of heavy equipment & materials
150 Million At Tribhuvan International Airport
5 National Armed Police Force Academy, Kathmandu Armed Police Force Nepal / China Railway Shisiji Group • Construction of Main Academy Building
• Supply of construction equipment & materials
90 Million Maharajgunj, Kathmandu
6 Gautam Buddha International Airport (Bhairahawa) Civil Aviation Authority of Nepal / Northwest Civil Aviation Group Co. Ltd. • Terminal Building Civil Structure
• Taxi-way & Runway Construction
• Supply of construction materials & equipment
105 Million
7 Construction of Road from Kailash Hill to Phedi, Bhaktapur Suryabinayak Municipality, Bhaktapur • Track opening from Kailash Hill to Phedi (12 km)
• Retaining & cross drainage structures
• Asphalt Concrete pavement
55 Million
8 22 km Road Excavation, Track Opening, Drilling & Blasting, Asphalt Pavement Kathmandu Valley Development Authority, Bhaktapur • Excavation and track opening (22 km)
• Retaining & cross drainage structures
• Asphalt Concrete pavement
210 Million