Works Completed
| S. No. | Name of Project | Client | Work Performed | Value of work-done (in NPR) | Remarks |
|---|---|---|---|---|---|
| 1 | Kathmandu–Terai/Madhesh–Expressway Road Project; Package-1 | Nepal Army / China State Construction & Engineering Corp. Ltd. |
• Boring Piles • Pile Connecting • Supply and renting of construction equipment |
140 Million | — |
| 2 | SASEC Roads Improvement Project; Butwal Road Expansion; Package-1 | Department of Roads / China State Construction & Engineering Corp. Ltd. |
• Construction of Major & Minor RCC Bridges (15 Nos) • Pre-cast Concrete Girder launching • Road Embankment Construction • Masonry Retaining Wall • Pile Testing (PIT, PDA, ULT, Pull-Out) • Supply & renting of construction equipment |
215 Million | — |
| 3 | SASEC Roads Improvement Project; Butwal Road Expansion; Package-2 | Department of Roads / China State Construction & Engineering Corp. Ltd. |
• Construction of Major & Minor RCC Bridges (7 Nos) • Pre-cast Concrete Girder launching • Road Embankment Construction • Pile Testing (PIT, PDA, ULT, Pull-Out) |
180 Million | — |
| 4 | Air Transport Capacity Enhancement Project (Kathmandu) | Civil Aviation Authority of Nepal / Sanjose S.A. |
• Runway Embankment Filling • Taxi-way Construction • Terminal Building Construction • Supply of heavy equipment & materials |
150 Million | At Tribhuvan International Airport |
| 5 | National Armed Police Force Academy, Kathmandu | Armed Police Force Nepal / China Railway Shisiji Group |
• Construction of Main Academy Building • Supply of construction equipment & materials |
90 Million | Maharajgunj, Kathmandu |
| 6 | Gautam Buddha International Airport (Bhairahawa) | Civil Aviation Authority of Nepal / Northwest Civil Aviation Group Co. Ltd. |
• Terminal Building Civil Structure • Taxi-way & Runway Construction • Supply of construction materials & equipment |
105 Million | — |
| 7 | Construction of Road from Kailash Hill to Phedi, Bhaktapur | Suryabinayak Municipality, Bhaktapur |
• Track opening from Kailash Hill to Phedi (12 km) • Retaining & cross drainage structures • Asphalt Concrete pavement |
55 Million | — |
| 8 | 22 km Road Excavation, Track Opening, Drilling & Blasting, Asphalt Pavement | Kathmandu Valley Development Authority, Bhaktapur |
• Excavation and track opening (22 km) • Retaining & cross drainage structures • Asphalt Concrete pavement |
210 Million | — |